POWEREEE Group Company
PowerTech Engineering & Consultant Co., Ltd.
Power Plant Construction Co., Ltd. |
| Project |
Year |
Owner |
Main Contract |
Responsible |
Period (Mouth) |
Remarks |
| Energy Saving Project Phase#4 |
2548 |
S&P Syndicate Public Co., Ltd. |
PowerTECH |
ED/PC/MP |
2 |
Turnkey Project |
| PEA Interconnecting 2.5 MW |
2548 |
E-SAAN Sugar Industry |
PowerTECH |
TKP |
3 |
Turnkey Project |
| Sub-Station 115KV/22KV 1 x 25/30 MVA |
2548 |
TT.CERAMIC Co. Ltd. |
PowerTECH |
TKP |
8 |
Turnkey Project |
| Electrical System For Emergency Load (Operating) |
2550 |
กองทัพอากาศ ดอยอินทนนท์ จ.เชียงใหม่ |
PowerTECH
SN. Taveekit Co., Ltd |
TKP
ED/PC/MP |
6 |
Turnkey Project |
| Electrical System High Voltage & Low Voltage (Future project) |
2550 |
โรงพยาบาล ลำปาง |
PowerTECH
|
TKP
ED/PC/MP |
2 |
Nov '07
(kick off) |
| Energy Saving Project Phase#5 (Future project) |
2550 |
S&P Syndicate Public Co., Ltd. |
PowerTECH
|
ED/PC/MP |
6 |
Jan '08
(kick off) |
| Power Plant Biomass Palm Process 9,500 KW (Future project) |
2550 |
Andaman oil palm Co., Ltd.
Andaman Bio- Energy Co., Ltd. |
PowerTECH
PPC
|
ED/PC/MP
O&M
M&E Construction |
12 |
Sep '07
(kick off) |
| Power Plant Biomass Palm Process 4,500 KW (Future project) |
2550 |
Siam Modern Palm Co., Ltd.
Modern Green Power Co., Ltd.
PowerEEE Group Company |
PowerTECH
PPC
|
TKP
O&M
Owner
M&E Construction |
12 |
Jan '08
(kick off) |
ED = Electrical Engineering Design
PC = Project Control & Consultant
MP = Man Power
O&M = Operating & Maintenance
TKP = Turnkey Project
Owner = Owner Projcet
PowerTECH = PowerTech Engineering & Consultant Co., Ltd.
PPC = Power Plant Constrution Co., Ltd. |